Measure out how much gutter is needed by measuring the distance for the section of rain gutter between the end.
Cutting hole in gutter.
Place the gutter section upside down on a solid work surface.
Use the measurement to mark the location for the cut on the piece of.
Step 2 drill four holes.
How to cut a vinyl gutter step 1.
Then i used a fine tooth metal cutting blade in my jig saw.
Bend the strip to fit and embed the flashing in the cement.
This one came with holes in it for rivets.
Here you can see the shape of the downspout flange i had.
Gutter repair patches are made of rubberized asphalt and are typically around 4 by 6 in 10 by 15 cm in size.
Feather the roofing cement out on the surrounding area to flatten any steep edges.
If you do want to trim it down with scissors though make sure it s at least 1 5 in 3 8 cm larger than the hole on all sides.
Step 1 is to draw the shape of the hole and drill s few holes around that shape.
If the holes are larger than nail holes use tin snips to cut a strip of flashing the same amterial as the gutter wide enough to fill the area.
Always affordable roofing on the sunshine coast providing you with basic info on your guttering needs.
The first thing you should do is decide where the best place to reconfigure one of your downspouts into a gutter.
Step 3 file the edges and apply sealant.
Step 4 secure the sleeve to the gutter.