Remove everything from your garage floor.
Do it yourself garage floor mudjack.
Step 1 drill a hole into the slab of concrete that you want to lift.
As a general rule a garage floor will take no more than four 4 drill holes but ultimately this has to be determined by the skilled mud jacker performing the work.
You ll need to have the items out of the garage for 48 hours after the second coat is applied.
Tech reviews and more.
Raising an entire 2 car garage floor costs 1 100 to 2 200 for mudjacking or between 2 500 and 5 400 for foam injection.
The first step is to take everything out of your garage.
I typically move a few things into the house and other items into the driveway or yard.
The workers will begin by drilling a hole in the slab of concrete that they will lift.
3 hour mudjacking job time lapsed to 1 min 30 seconds sunken garage floor concrete leveling duration.
Mudjacking a garage floor is cheaper than repouring new concrete or using a self leveling compound.
The hole should be close to the area of the slab that you want to lift and large enough to fit the hose of a slurry pump into it.
A jacking pump uses compressed air which forces slab jacking material through an attached hose.
The hydraulics allow the slurry to raise the concrete to the height it needs to be.
Cover everything with a tarp in case it rains.
Once holes are drilled through the slab and into the soil beneath it the hose feeds the material into the holes.
After this they use a pressurized pump to insert the slurry.
Mudjacking is very easy.
The average cost of mudjacking 2 to 4 sections of a garage floor is 300 to 900.